Day 2


The second lorry arrives on time at the start of day 2. The opening top and sides of the trailer allows for all of the components to be off loaded in a couple of hours enabling easy selection of components to be craned into position including large sliding doors and roof trusses.

The first floor wall panels were lifted into position in the order described on the drawings. On top of these were then lifted the gable wall pieces and roof trusses